Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 49 results ...

Abdelkhalek, S I (2022) Managing the inspection process of concrete bridge decks, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, W T P (2009) Construction industry development and government policy, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fu, W K (2004) The effect of experience in construction contract bidding, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

  • Type: Thesis
  • Keywords: effectiveness; efficiency; optimization; construction project; construction safety; in-situ; health and safety; manufacturing; productivity; safety; virtual prototyping; Hong Kong
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305154037
  • Abstract:
    Manufacturing companies have made many significant improvements in both productivity and management efficiency over the last century. This progress, however, has not been matched in the construction industry, which is still beset with a variety of long standing problems including time and schedule overruns, poor health and safety conditions as well as low quality and productivity. In this research, through the use of Virtual Prototyping (VP) technology, the IKEA model as a representative of the manufacturing industry is studied and implemented in construction project management (CPMa) to optimize design and construction processes and simplify management activities. As a typical representative of the manufacturing industry, the IKEA Group is selected and analysed and the IKEA model is proposed. The model's feasibility for the construction industry is discussed using the questionnaire method and comparison analysis method. The key technique for using the IKEA model in the construction industry, i.e. VP technology, is customized. The VP-based IKEA model, then, is applied to construction project management (i.e. cast-in-situ construction and precast construction). The aim of using the model to cast-in-situ construction projects is to change this situation (time and cost overruns and quality problems) in two ways, i.e. the optimization of construction processes and the simplification of management activities. Precast construction, on the other hand, is different from conventional cast-in-situ construction. In theory it has many advantages (e.g.rapid construction, high quality), however these are seldom achieved in real-life construction projects. In order to make precast construction more effective, the IKEA model is applied to precast construction management via the combination of VP technology and this focuses on design-production-transportation optimization and assembly optimization. Two real-life construction projects in Hong Kong are presented to demonstrate the feasibility and effectiveness of the IKEA model, respectively, in cast-in-situ construction and precast construction. It is shown that the VP-based IKEA model can improve construction project management by reducing construction time and cost, improving construction safety and quality, especially for precast construction. Finally, the conclusions of this research are drawn and some suggestions for future research are presented.

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Kam, C W (2000) Quality assurance of construction works in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities, Unpublished PhD Thesis, Department of Civil and Structural Engineering, Hong Kong Polytechnic University.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ye, K (2009) Modelling competition intensity in construction market, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Zhang, X (2010) Competitiveness for real estate developers: a China study, Unpublished PhD Thesis, Department of Building and Real Estate, Hong Kong Polytechnic University.